Wednesday, January 20, 2010


Sorry folks, that it has been months since I have posted in this blog. The building has consumed our time as it progresses. Progress is the key word here. The foundation was poured back on October 9 and then the floor on November 24, 2009. We added a small canister of (my mom)Emelyn's ashes to the foundation corner which will be in Dad's studio, and placed a small Talevera tile from San Miguel de Allende on top of the canister, and also spread some ashes over the pour after it was finished. The TSS (thermal storage solutions) pit for an ECX vault (Environmental Climate Exchange) was dug to the left of the photo above. The size of storage is 1800 cubic feet. It is designed to store underground the heat from the wood boiler and solar panels.

1 comment: